The first project to be implemented from the Stormwater Master Plan prepared by ForeSite was the area for Governor’s Park and Independence Playground. The design featured a constructed wetland to treat run-off from a future park and a bioswale to treat approximately 3 acres of upstream impervious area. In keeping with our design philosophy, we looked to challenge the benefits of the stormwater feature and designed a tidally connected fish pond between the constructed wetland and it’s outfall to Broad Creek.